Tutorial 5) Telescope assembling — ALPIDE testing setup
USBs:
Two USBs cable carry the signals collected from the two USB boards to the PC
(be
careful since some of the USB ports are not working).
Overview of layout for 1 scintillator
Powering:
Big power supply:
Big power supply
Purpose
Comments
Channel 1
REF DAQ
5V
, 3A
Channel 2
REF VBB
3V, 1mA
Reverse biased at power source to give
-3V
Channel 3
DUT VBB
Channel 4
HUB #2
18V
, 800mA
This powers one of the two USB boards
Small power supply
Purpose
Comments
Channel 1
USB HUB PWR 18V
, 800mA
This powers one of the two USB boards
Channel 2
PMT
12V, 150mA
Channel 3
PMT
12V, 150mA
Other settings:
FUSE LINKING:
REF DAQ → REF VBB
REF VBB → REF DAQ
FUSE LINKING:
PMT 1 → PMT 2
PMT 2 → PMT 1
FUSE DELAY for all channel 100ms
(gives
100ms to settle before testing if it is above the limit)
OVER VOLTAGE PROTECTION:
REF DAQ works at 5V, so we set to 5.5 V
(make
sure that it does not get exposed to over tension)