Type-Bp
- Wiring diagram:
Wiring diagram are summarized in JGWdoc.
See JGW-E1604937 VIS Document and Drawing Tree (Electronics).
- Tower and Payload
A. Cabling check inside the vaccum chamber:
Measurement was performed by checking resistance, inductance, and foreward voltage at feedthrough ports on the vaccum chamber.
Resistance and forward voltage were measured by digital multimeter “Sanwa CD772”.
Inductance and capacitance were measured by LCR meter “Lutron LCR-9183”.
Inductance was measured at 1kHz.
- Feedthrough flange position of chamber
- Port position on the feedthrough flange
- Measurement
The cable connections were checked at the feedthroughs (PRM, PR2, PR3)
| Pin assign | PR2 | PR3 | PRM |
TMcoil H1 | 1-6: blank 2-7: 3-8: blank 4-9: blank | port number: 1-2 16.8 Ω 8.615 mH | port number: 2-8 17.1 Ω 8.586 mH | port number: 1-2 17.3Ω 8.567mH |
TMcoil H2 | 1-6: blank 2-7: 3-8: blank 4-9: blank | port number: 2-3 16.9 Ω 8.565 mH | port number: 2-5 17.1 Ω 8.582 mH | port number: 1-3 17.5Ω 8.534mH |
TMcoil H3 | 1-6: | port number: 3-2 | port number: 4-7 | port number: 4-4 |