Joint Development
- Tools
- Overall Task backlog (temporary?)
- List of pilot-specific tasks
- Not a list of tasks for individual projects unrelated to pilot
- GitHub Project in Lightsources organization
- Meta-packages for installing all tools at a beamline
- Simulated beamlines!
- Nikea Slack Workspace
- invite link: https://join.slack.com/t/nikea/shared_invite/enQtMjYxODQ2MTYxMTU1LWE3MWE4YWE3NzNjMGI1MThhNWJjNDVjNjcwZjdiYWQyOWI0MGUyZWYzMTZhYzY4Y2IwMzljY2Y4MDViNTAyODE
- Current allowed Domains: bnl.gov,lbl.gov,slac.stanford.edu,anl.gov,ornl.gov,frib.msu.edu,diamond.ac.uk,synchrotron.org.au,cars.uchicago.edu,stfc.ac.uk,sinap.ac.cn,xfel.eu,lanl.gov,ansto.gov.au,student.sjcny.edu,lycoming.edu
-
- Meetings
- Synchrotron Coalition for Developers
- Scientist Meeting
-
- Management Meetings
- Working Group Meeting
- Milestones
- List of work items by ALS User Meeting
- Working Groups
- Infrastructure
- bluesky
- xicam
- hpc (Bjoern)
- science and algorithm
- xpcs (Qingteng)
- ptychography (Andi)
- tomography (Dula)
Action Items
- Common to the Pilot
- ERCAP proposal for the Pilot (3 month) (ALCF and OLCF)
- System level
- Decide on a suggested authentication architecture (2 month)
- XPCS
- Agree on common description of the ROI (3 month)
- Agree on a common data keys description (6 month)
- Define common description of the data analysis
- Multi parameter vis for analysis
- Common analysis library across facilities.
- Simulator: 2 months (Dinesh and Maksim)
- System Testing
- Developing realistic detector simulation
- Develop simulated beamline for integration testing
- Develop system tests for running on real hardware
- Bluesky / xi-cam / intake
- connect xi-cam ↔ intake