Alpide Testbeam @ CERN SPS July
What to do before interventions:
change currents
all planes are plugged
covered well
take the pc →replug network
FPGA progr here
Daily
Todo/
M
eetings:
11
July
:
8am: the 0V VCASN scan is complete. The 3V VCASN scan has just started. However TOF asked to increase luminosity.
830am: beam is lost
~ 840am: beam is back. Collimators are opened.
940am
I start a 20k run with 3V
(run282095710_230711095715.raw)
0
8
July
:
Existing datasets
(and
then migrate them to EOS):
First alignment data with Vth>0.9 PMT, dt=100 →
Events
:
Aligned dataset with Vth>0.9 PMT, dt=100 → test pile up in analysis →
Events
:
Aligned dataset with Vth>0.3 PMT, dt=100 → too much pile up — not usable →
Events
:
Aligned dataset with Vth>0.5 PMT
dt=400
Events
16k
dt=600 →
Events
O(100)
dt=800 →
Events
Strobe-length?
Analysis:
which datasets are usable maybe tightening analysis cuts?
what is the max number of tracks/event we can stand?
Define beam configurations:
Check integration of
→ Paolo for the configuration:
Check beam:
07 July
Plans for the Day:
Data taking at PS
50k at existing trigger threshold
50k at new threshold(s)
DUT Threshold scans at:
0V
1V
2V
3V
(double
check)
Investigate: What is the time resolution of the scintillator? Of the PMT?
0
6 July
T
odo from
Y
esterday:
[todo]
update the instructions
[todo]
update the Log
[todo]
copy the data to cernbox
(removing
the garbage runs?)
Plans for the
D
ay:
Discuss priorities
Please turn on JavaScript to use Paper in all of its awesomeness. ^_^
What to do before interventions:
Daily Todo/Meetings:
11 July:
08 July:
07 July
06 July