Heater test in vacuum
Plan of the heater test in vacuum.
R. Takahashi
Control sequence
- Set temperature is changed by 2 deg. and kept in one hour.
Monitor channel
- GAS LVDT (F0, F1, F2, F3, BF)
- BF damper (V)
- BF temperature
Note
- DC control for GAS filters is off.